Title 4 PUBLIC UTILITIES
Chapter 4.08 FLOOD DAMAGE PREVENTION
4.08.310 Effect upon outstanding building permits.
Nothing contained in this chapter shall require any change in the plans,
construction, size or designated use of any building, structure or part thereof
for which a building permit has been granted by the chief building inspector or
his authorized agents before the time of passage of the ordinance codified in
this chapter; provided, however, that when construction is not begun under such
outstanding permit within a period of sixty days subsequent to passage of the
ordinance codified in this chapter, construction or use shall be in conformity
with the provisions of this chapter. (Ord. O-13-06 (part), 2006)
<< previous | next >>